Delivered to your home* price: ◉ Europe...
Rate delivered to your home* : ◉ Europe...
Rate delivered to your home* : ◉ Standard...
Rate delivered to your home* : ◉ Standard...
Rate delivered to your home* : ◉ Europe stock...
Rate delivered to your home* : ◉ Standard...
Rate delivered to your home* : ◉ Standard...
Rate delivered to your home* : ◉ Europe...
Rate delivered to your home* : ◉ Standard...
Home delivery price* : 1 Roll : 19.88 €/m²...
Flame-retardant aluminium adhesive roll for thin...
Rate delivered to your home* : ◉ Europe...
Rate delivered to your home* : ◉ Europe...
Heating film for specific applications 25-year...
The radiant heating CRIR 1800 is intended for the heating...
Rate delivered to your home* : ◉ Stock France...
Rate delivered to your home* : ◉ Stock France...
Connected radio thermostat . Programmable device...
Rate delivered to your home* : ◉ Express...
No more fogging up your mirror! Mirolia eliminates...
We create the heated mirror of your dreams 2 options...
Turn your mirror into a heated mirror. Freedom...
Mirolia Panel Deco is a decorative heated mirror with...
Table immersive to animate your evenings with your...
Advantages : Removes the risk of...
Price delivered to your door* : Set of 50...
Earth connection of our aluminum insulators for the...
*Metropolitan France and Belgium only.
Ideal for creating an air gap and limiting contact points...
The purchase of our products we undertake, which is why...
Published:
04/30/2021 14:04:51
Categories:
Customer projects
, News and short videos
, Thin reflective insulation
On a renovation job, duration often counts as much as price. A room out of use for two weeks has a real cost for a household, and a direct cost for a shop or a practice that has to close.
It is dry. No filler, no tape, no sanding, so no waiting for anything to dry. The schedule is no longer dictated by the chemistry of materials but only by actual labour time.
Survey and setting out, fitting the rail, fitting the insulation, closing the plenum, tensioning the fabric. Each step follows the previous one immediately, which is why an ordinary room is dealt with within the day.
Unlocated services, light fittings decided along the way and substrates in poor condition. None of those three is a surprise if the survey was done properly, and all three are hard to put right afterwards.
No sanding dust, no smell, no skip. Floor protection and tidying up in the evening are enough, which clearly sets this kind of work apart from a traditional ceiling replacement.
A fast job is still a prepared job. The speed comes from the absence of dead time, not from steps left out, and it is precisely the preparation that produces that absence of dead time. A firm that announces one day and takes three surveyed badly, it did not work badly, and the difference is settled before the first hole is drilled.
The fitting technique is set out on the dedicated page, and the insulation on its data sheet.






